PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls

Project overview

Use our local experts combined with global capability to make your project a success

We have been delivering projects across all sectors around the world for over 50 years. Our local experts can combine knowledge of your challenges and needs with our global experience and expertise to overcome any issues on site.

If there is a specific construction or engineering challenge you face, we can deploy our full range of products, services and experience to overcome these and provide the best solution.

Afterall, providing the best service and solution to our customers is what drives us every day.

All Projects

Up to 70,000 visitors flock daily to Australia's largest shopping centre which is now completely covered by a gigantic glass roof – the result of an expansion project. Work was carried out while the centre remained opened for daily business; the schedule for the entire construction project was extremely short. (Photo: David McArthur Parallax Photography)
Western Sydney Stadium
The 15m high ‘Scoops’ are a defining feature of the building.
Continuously adjustable for radii ranging from 2.5m upwards including standard working platform bracket; decking and guardrails were client supplied to provide the safety condition.
Adelaide Oval Redevelopment
Fiona Stanley Hospital
Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
126 Phillip Street
LPS screen is a weight-optimized protection system due to the metal mesh panels. This system was used as a perimeter protection and was preassembled in PERI yard.
Redevelopment Barangaroo South
ICC Hotel
UTS Central
Brighton on Broadwater
Bonville Bypass
Trio placed for first pour 10.8m high
PERI TRIO & CB240 plus special formwork for acrched soffit.
Roof formwork
The TRIO wall formwork system being used to construct the bridge abutment.
Pier Head Platform and base slab formwork installed
With the help of PERI Formwork and scaffolding solution, the 5-metre high V-shaped piers with 60 degree inclination could be accurately and cost-effectively constructed.
The use of a custom designed and load-optimized formwork carriage results in the simple operation and movement of the large 330m² unit.
(Photo: Images courtesy of TfNSW)
PERI provided a safety screen solution at Pendle Hill to allow for a new platform structure to be built over a live metro railway line.
Norwest Station
New England Highway Overpass
Castle Hill Station
Moorebank Intermodal Terminal
Cowal Gold Mine
Darwin LNG Project
Pluto LNG Project
Lifting Trio SB into place.
A void was left in the internal platform to allow crane access so that construction could commence on the sampling floor, located 45m above the ground.
Pump Station 10.8m formwork.
Dubbo Sewerage Treatment Plant
Infrastructure buildings
Ross Dam sluice gate pier.
Spillway.
Moorabbin Culvert and Wing Wall
Subiaco WWTP
Clyde Detention Tank
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

Contact us – we will be happy to help you.

Contact us