New England Highway Overpass

New England Highway Overpass
Toowoomba, Australia

  • The Toowoomba Second Range Crossing project consists of a 41 km bypass, including: 24 bridges, 6 interchanges, 9 creek crossings and one viaduct.
  • 41-kilometre long bypass route from the Warrego Highway at Helidon Spa in the east to the Gore Highway at Athol in the west, via Charlton.
  • Delivering an alternative crossing of the Toowoomba Range for all classes of heavy and super heavy vehicles
  • Relieve pressure on Toowoomba’s roads, and enhance the liveability for the city’s residents.

Expected completion end of 2018

 

 

 

 

 

Location
Main Application
Civil Engineering
Project participants
Customer: Nexus Delivery

The Project

Impressions from the project process
“Trying to come up with a formwork system design that met all of our needs was a challenge. After careful consideration, we decided the best solution was to use the PERI VARIO system. This system allowed us to form this complicated bridge arch support, as well as meet all of our time requirements, safety components and budget. The entire process from engineering to installation of the formwork was seamless, as PERI Australia provided the expertise and support needed. With the help and supervision of PERI site personnel, we were able to construct the shutters safely, quickly and properly. We definitely wouldn’t hesitate to utilise PERI’s system and expertise in the future”.
Mark Priest
Project Engineer – Structures - Central

Related Products

Are you working on a project like this?

Contact us – we will be happy to help you.
New England Highway Overpass
New England Highway Overpass